TEL : +(91)-141-4026198 , 4023470
 
 
HOME : PROJECTS & SERVICES  
   
Quick Links
 
 
 
WHY CHOOSE US ?
 
Focus on R & D
Quality Testing of Product
Highly Proficient Team
Quality Improvements
Competitive Pricing
Timely Deliveries of Products
Customers Satisfaction
PROJECTS & SERVICES  
 
 
lshwar Group has a vast experience and expertise in the power distribution, transmission and management domain to execute complex EPC projects. We have proved our capabilities by timely completion of numerous projects across varied geographical terrain and conditions in adverse climatic conditions. Ishwar Group has the most advanced equipment, modem technique and software along with its specialists having vast experience in executing ECC contracts.

We have a complete highly qualified and experienced technical team of engineers for developing projects for Distribution of power and Transmission of power. We are the only company in our state doing Electrical erection works on Turnkey basis backed by our own production units for timely completion of projects. Our team is fully qualified to design projects for proper saving of energy in Distribution and Generation by preventing theft and leakage of energy. We have complete team of experts backed by all required machinery to execute the following type of power projects.
 
  Laying of LT and HT Cables starting from 1.1 KV, 11KV upto 132KV
  Laying of electric lines starting from 1.1KV, 11KV upto 220KV
  Electric Sub stations of 11KV, 33KV,66KV,132KV & 220 KV
  Rural Electrification
  Up gradation of distribution and transmission systems
  Projects for reduction of power distribution losses
  Projects for preventing theft of electricity
  Laying of LT and HT Cables starting from 1.1 KV, 11KV upto 132KV
  DT Metering Projects
 
We have totally changed the concept of executing electrical projects by replacing manual methods of execution by almost fully mechanized methods by which projects are completed in short time durations.
 
Till now we have successfully completed reputed projects like :
 
  GiralPower Project,Jaisalmer Rajasthan
  Narmada Project,Sanchore Rajasthan
  Rajiv Gandhi Rural Electrification Scheme,Rajasthan
  R-APDRP, Punjab and Haryana
  Urban Focus Scheme, Rajasthan
  HVDS/LVDS works, Haryana
 
HT Tube well Connections,Haryana different types Underground and overhead Cabling, construction of 1.1 KV, 11KV, 33KV, 66KV, 132KV, 220KV, 400KV Lines and Sub-Stations works on Turnkey basis. We initially started with small orders and now have an experience of more than 10 billion INR of works completed on Turnkey basis.
 
We have till now successfully completed following:
 
  4 substation with associated lines of 400KV
  6 sub stations of 220KV with associated lines
  118 Km 220 KV Line
  14 substations of 132 KV with associated lines
  98 Km 132KV lines
  28 substations of 33/11KV
  758 Km 33KV Lines
  4088Km of 11kV Lines
  More than 74000Km LT Cabling works successfully on Turnkey basis
 
We have recently done projects for Energy loss reduction ,proper accounting and metering of electricity The details of project is as follows: We would like to introduce to your worthy attention towards meter shifting scheme in Pillar Boxes under URBAN FOCUS SCHEME under which renovation of high theft prone areas is done by replacing the bare conductor by LT XLPE Cables and by shifting the meters outside the consumer premises in metal deep drawn powder coated boxes. We have done various projects in various towns village and cities of Rajasthan and Punjab State and it was observed by the electricity boards that they were directly benefited by this scheme as under :
 
PREVENTION OF DIRECT THEFT :
 
Under this direct theft by hooking is prevented as bare conductor is replaced by LT XLPE Four Core Cables and its not possible either to puncture this cable nor hooking is possible in four core cables. Further life of four core cables is much more than insulated conductors.
 
PREVENTION OF DIRECT THEFT :
 
Under this direct theft by hooking is prevented as bare conductor is replaced by LT XLPE Four Core Cables and its not possible either to puncture this cable nor hooking is possible in four core cables. Further life of four core cables is much more than insulated conductors.
 
PREVENTION OF THEFT FROM TEMPERING OF METERS :
 
As all energy meters are relocated at a common place in a big box consisting 1-20 meters in a single box which is properly locked by energy department. So, tempering of meter is not possible.
 
REDUCTION IN CONSUMPTION OF ELECTRICITY :
 
As energy meters are shifted outside consumer premises, so theft by direct hooking or by tempering meters is prevented and as a result consumption of electricity is reduced to a great extent
 
REDUCTION IN ELECTRIC SYSTEM FAILURE :
 
As energy theft is prevented, transformers running on overload due to theft of energy comes under load and as result chances of transformer failure is negligible and as result system break downs is prevented.
 
BASIC OUTLINE OF SCHEME AND MATERIAL USED :
 
First of all our expert team visit the distribution system which is to be converted under this scheme and prepares a estimate of material and the same is submitted to the concerned authorities for approval and then under this scheme the entire bare conductor is replaced with 4 Core LT XLPE Cables ( four core LT XLPE Cable is used in place Aerial Bunched Cable as it is very easy to puchure AB Cable for hooking and Four Core cable cannot be punchere and if tried to puchure it gets damaged) on existing poles only and if any intermediate poles are required the same are erected in order to avoid loose sags of cables erected. After replacing conductor with cable meter boxes are grouted at the marked place as per actual requirement. All the boxes grouted are properly connected with bore chemical type earthing connected to the boxes with the help of galvanized flat. After this all the consumer meters are relocated from houses to the boxes with the help of 2core PVC flat Cables.
 
 
Benefits Of Scheme :
 
  Minimum T&D losses achieved as direct hooking is totally stopped and consumers are not able to temper energy meter
  Energy saved is sufficient to provide 20-24 hrs supply.
  Reduction in Feeder Load & Consumption up to 50% as theft is prevented
  Reduction in Transformer Loading & Consumption up to 50%
  R-Y-B load Balancing of transformers by providing equal number of connections on each Phase.
  Number of distribution Transformer will be rendered spare/surplus due to decrease in unauthorized
  Tampering of meter not possible.
  Chances of Electrical Accident are minimum as overhead naked conductors has been completely eliminated and all the Pillar Boxes and transformer are properly Earthed having resistance less than "1" Ohm.
  Easiness in meter reading without entering the consumer premise
  Reduction in breakdowns as the whole distribution comes under load due to which chances of
 
We have done such projects in Punjab and Rajasthan and very good results are observed.

We at lshwar Group today have solid engineering base, coupled with a self-sufficient infrastructure base & professional service standards, which form the pillars of the organization with a combination of expertise, experience and stringent quality control measures is committed to Total customer satisfaction by ensuring consistent high quality products, on time delivery and competitive price through continual improvement and adhering to the system of lSl, REC and Central Electrical Authority.
 
We can do specialized projects also for government such as:
 
 
1. Energy Loss Reduction Programme    
     
Introduce to your worthy attention towards meter shifting scheme in Pillar Boxes under Energy Loss Reduction Programme under which renovation of high theft prone areas is done by replacing the bare conductor by LT XLPE Cables and by shifting the meters outside the consumer premises in metal deep drawn powder coated boxes. By this we can prevent energy theft and reduce energy losses and increase efficiency of distribution system.
 
     
2. Underground Power Distribution    
     
We have an expertise in converting the overhead distribution system into complete underground system. Under this all power lines from sub-station to consumer point the complete system is underground. By this power break downs and accidents due to overhead lines are avoided.
 
     
3. New Power Lines and Sub Stations    
     
We can design new power lines of 1.1KV, 11KV, 22KV, 33KV, 66KV, 132KV, 220KV and 400KV and we can also design Sub Stations accordingly.
 
     
4. Concrete Poles and Lattice Tower Solutions    
     
We have observed that your country is having shortage of wooden poles and electrification in your country is suffering a lot due to this. We can manufacture concrete poles and Lattice towers
   
     
  Concrete Poles
    Concrete Poles can be manufactured very fast and are very low on cost.
  Steel Lattice Towers
    Steel Lattice Towers are made up of steel sections and are galvanized for better life upto more than 80 years. They provide a very good height clearance upto 16 meters and carry upto 3 33KV/11KV Line circuits saving the cost and space.
     
 
5. Solar Power Parks    
     
We can undertake projects to develop solar parks for government to generate electricity. We can do solar projects in some of the ways below.
   
     
  Small Solar Power Parks for Ruler Area
    We can develop small solar parks sufficient to energize small rural villages. In this project we make a small solar park near a village and connect the village distribution system through a grid. The cost of this project is very much lower than big Solar parks as we don’t have to develop big transmission and distribution system. We can just place small Solar Park near village and connect it to existing distribution system. This system can be very much helpful for areas where still there is no electricity.
 
     
 
 
         
  QUICK LINKS   ISHWAR GROUP QUICK CONTACT
 
  HOME
  ABOUT COMPANY
  MISSION & VISION
  INFRASTRUCTURE
  WHY CHOOSE US
  QUALITY POLICY
  QUALITY CERTIFICATES
  PROJECTS & SERVICES
  ENQUIRY
  CONTACT US
  DISCLAIMER
  TERMS & CONDITIONS
  PRIVACY POLICY
  CLIENTS
   
  POWER CABLES
  ALUMINIUM CONDUCTORS
  STEEL FABRICATION
  P.C.C. POLES
  DOMESTIC WIRES
  ENERGY METER
  TURNKEY PROJECTS
  SOLAR ENERGY
OFFICE
F - 79 (B) , Road No-6
Vishwakarma Industrial Area
Jaipur-302013,Rajasthan (India)
Tel : +(91)-141-4026198 , 4023470
 
 
Ishwar group , Ishwar metal industries , Ishwar cables pvt. Ltd. , Iswar Traditional export pvt. Ltd. , K.S. infra transmission pvt. Ltd.